57
|
cfastie |
February 11, 2015 14:58
| almost 10 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Parts and Crafts, Sommerville, MA
- Contact Katie and Will
- SN_____
- Projects:
Maintenance:
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
Build hours:
- Initial build hours 12/2013: 11
- build hours on 02/07/2014: 245
- build hours on 08/18/2014: 640
- build hours on 01/01/2015: 1000
- build hours on 02/08/2015: 1200
Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers
- Prototyping spectrometer
Maintenance:
- tightened all hex bolts holding plywood frame together 12/2014
- upgraded firmware to Makerbot v. 7.5
- broken fan replaced 12/24/2013
- new nozzles installed 01/04/2014
- 24v/5v regulator replaced 01/17/2014
- Filament feed mechanism upgraded (all prints were failing) (MakerBot replacement parts for right extruder) 02/06/2014
- Filament feed mechanism for left extruder printed and installed with MakerBot hardware 04/2014
- Printed feet, spool holders, and LCD/keypad cover
- lubricated noisy fan in motherboard compartment with SuperLube 06/2014
- Replaced x-axis motor cable (all prints were failing) 08/18/2014
- x-axis idler pulley is lubricated every week with SuperLube.
- Installed new ball bearing x-axis idler pulley from Alm Gear ($18). 01/20/2015
- Tightened all hex bolts holding plywood frame together. They were all loose again after 1000 hours of printing. 01/21/2015
- Tightened both grub screws on all six pulleys. They all tightened, but I noticed no difference in performance. 01/29/2015
- Removed the fan from the motherboard compartment. It is not needed for cooling (long story) and just makes noise. 02/11/2015
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN 12328
- Projects:
- 24v/5v regulator replaced 3/14
- spool holders replaced
indicator LEDs disconnected to prevent voltage damage to board by motors.
|
Revert |
|
56
|
cfastie |
February 11, 2015 14:39
| almost 10 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Parts and Crafts, Sommerville, MA
- Contact Katie and Will
- SN_____
- Projects:
Maintenance:
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
Build hours:
- Initial build hours 12/2013: 11
- build hours on 02/07/2014: 245
- build hours on 08/18/2014: 640
- build hours on 01/01/2015: 1000
- build hours on 02/08/2015: 1200
Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers
- Prototyping spectrometer
Maintenance:
- tightened all hex bolts holding plywood frame together 12/2014
- upgraded firmware to Makerbot v. 7.5
- broken fan replaced 12/24/2013
- new nozzles installed 01/04/2014
- 24v/5v regulator replaced 01/17/2014
- Filament feed mechanism upgraded (all prints were failing) (MakerBot replacement parts for right extruder) 02/06/2014
- Filament feed mechanism for left extruder printed and installed with MakerBot hardware 04/2014
- Printed feet, spool holders, and LCD/keypad cover
- lubricated noisy fan in motherboard compartment with SuperLube 06/2014
- Replaced x-axis motor cable (all prints were failing) 08/18/2014
- x-axis idler pulley is lubricated every week with SuperLube.
- Installed new ball bearing x-axis idler pulley from Alm Gear ($18). 01/20/2015
- Tightened all hex bolts holding plywood frame together. They were all loose again after 1000 hours of printing. 01/21/2015
- Tightened both grub screws on all six pulleys. They all tightened, but I noticed no difference in performance. 01/29/2015
- Removed the fan from the motherboard compartment. It is not needed for cooling (long story) and just makes noise. 02/11/2015
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN 12328
- Projects:
- 24v/5v regulator replaced 3/14
- spool holders replaced
indicator LEDs disconnected to prevent voltage damage to board by motors.
|
Revert |
|
55
|
cfastie |
January 22, 2015 05:00
| almost 10 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Parts and Crafts, Sommerville, MA
- Contact Katie and Will
- SN_____
- Projects:
Maintenance:
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
Build hours:
- Initial build hours 12/2013: 11
- build hours on 02/07/2014: 245
- build hours on 08/18/2014: 640
- build hours on 01/01/2015: 1000
Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers
- Prototyping spectrometer
Maintenance:
- tightened all hex bolts holding plywood frame together 12/2014
- upgraded firmware to Makerbot v. 7.5
- broken fan replaced 12/24/2013
- new nozzles installed 01/04/2014
- 24v/5v regulator replaced 01/17/2014
- Filament feed mechanism upgraded (all prints were failing) (MakerBot replacement parts for right extruder) 02/06/2014
- Filament feed mechanism for left extruder printed and installed with MakerBot hardware 04/2014
- Printed feet, spool holders, and LCD/keypad cover
- lubricated noisy fan with SuperLube 06/2014
- Replaced x-axis motor cable (all prints were failing) 08/18/2014
- x-axis idler pulley is lubricated every week with SuperLube.
- Installed new ball bearing x-axis idler pulley from Alm Gear ($18) 01/20/2015
- Tightened all hex bolts holding plywood frame together. They were all loose again after 1000 hours of printing. 01/21/2015
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN 12328
- Projects:
- 24v/5v regulator replaced 3/14
- spool holders replaced
indicator LEDs disconnected to prevent voltage damage to board by motors.
|
Revert |
|
54
|
cfastie |
January 02, 2015 04:30
| almost 10 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Parts and Crafts, Sommerville, MA
- Contact Katie and Will
- SN_____
- Projects:
Maintenance:
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
Build hours:
- Initial build hours 12/2013: 11
- build hours on 02/07/2014: 245
- build hours on 08/18/2014: 640
- build hours on 01/01/2015: 1000
Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers
- Prototyping spectrometer
Maintenance:
- tightened all hex bolts holding plywood frame together 12/2014
- upgraded firmware to Makerbot v. 7.5
- broken fan replaced 12/24/2013
- new nozzles installed 01/04/2014
- 24v/5v regulator replaced 01/17/2014
- Filament feed mechanism upgraded (all prints were failing) (MakerBot replacement parts for right extruder) 02/06/2014
- Filament feed mechanism for left extruder printed and installed with MakerBot hardware 04/2014
- Printed feet, spool holders, and LCD/keypad cover
- lubricated noisy fan with SuperLube 06/2014
- Replaced x-axis motor cable (all prints were failing) 08/18/2014
- x-axis idler pulley is lubricated every week with SuperLube, purchased a new ball bearing pulley from Alm Gear, will install soon
.
|
Revert |
|
53
|
mathew |
September 17, 2014 21:40
| about 10 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 245
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN 12328
- Projects:
- 24v/5v regulator replaced 3/14
- spool holders replaced
indicator LEDs disconnected to prevent voltage damage to board by motors.
|
Revert |
|
52
|
cfastie |
February 08, 2014 05:14
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 245
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
51
|
cfastie |
February 07, 2014 15:02
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
50
|
cfastie |
February 07, 2014 15:02
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
49
|
cfastie |
February 07, 2014 15:01
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
48
|
cfastie |
February 07, 2014 14:59
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
47
|
cfastie |
February 07, 2014 14:57
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
- Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
46
|
cfastie |
February 07, 2014 14:30
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
45
|
cfastie |
February 07, 2014 14:29
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
44
|
cfastie |
February 07, 2014 14:28
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
43
|
cfastie |
February 07, 2014 14:27
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
- Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
42
|
cfastie |
February 07, 2014 14:26
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
- Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
41
|
cfastie |
February 07, 2014 14:26
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
- Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|
40
|
cfastie |
February 07, 2014 14:24
| almost 11 years ago
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 220
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
- Maintenance:
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN______
- Projects:
- Maintenance:
|
Revert |
|