Makerbot machine logs
This is a revision from March 08, 2015 23:28.
View all revisions
The status of Public Lab's 10 MakerBot Replicators.
- Public Lab office #1, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Contact: Stevie Lewis stevie at publiclab dot org
- SN______ on loan
- Build hours:
- Projects:
- Maintenance:
- The 5 volt power upgrade has been performed.
- Not the delrin plunger drive mechanism.
- Public Lab office #2, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
- Contact: Stevie Lewis stevie at publiclab dot org
- SN: 11833 (Brooklyn)
- Loan log
- out 03/02/2015 to Dan Henry dhenry at gmail dot com
- Loan log
- F/W: MightyBoard v7.3
- Build hours on 03/08/2015: 168 hours
- Projects:
- Demonstrations at New Orleans public libraries for Teen Tech Week 2015
- Maintenance:
- The 5 volt power upgrade has been performed.
- Not the delrin plunger drive mechanism.
- Makerspace, Mobile, Alabama
- Contact: Stevie Lewis
- SN _____ not operational
- Build hours:
- Projects:
- Maintenance:
- The 5 volt power upgrade has been performed.
- Not the delrin plunger drive mechanism.
- Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN 000J
- S/W version: Sailfish Replicator1 v 7.6
- Build hours: 135 as of mid Feb 2015
- Projects:
- Demonstrations at the Picayune library the first Thursday of the month.
- Printing miscellaneous parts for local FIRST robotics team number 1421.
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break is now fixed.
- The 5 volt power upgrade has been performed.
- Front panel controls tilted.
- Not the delrin plunger drive mechanism.
- Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Build hours:
- Projects:
- Maintenance:
- Public Lab office, Pfizer building, 630 Flushing Avenue, Brooklyn, NY
- Contact: Liz Barry
- Operational
- Build hours:
- Projects:
- smart phone specs.
- Maintenance: overall upgrade on Feb 4, 2015 by Aaron who runs Parsons 3d print lab.
- note: there are three other models of 3d printers in this space
- Parts and Crafts, Sommerville, MA
- Contact Katie and Will
- SN_____
- Build hours:
- Projects:
- Maintenance:
- Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Build hours:
- Projects:
- Maintenance:
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
Build hours:
Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers
- Prototyping spectrometer
-
- tightened all hex bolts holding plywood frame together 12/2014
- upgraded firmware to Makerbot v. 7.5
- broken fan replaced 12/24/2013
- new nozzles installed 01/04/2014
- 24v/5v regulator replaced 01/17/2014
- Removed left nozzle so it could not keep knocking over my prints. 01/20/2014
- Filament feed mechanism upgraded (all prints were failing) (MakerBot replacement parts for right extruder) 02/06/2014
- Filament feed mechanism for left extruder printed and installed with MakerBot hardware 04/2014
- Printed feet, spool holders, and LCD/keypad cover
- lubricated noisy fan in motherboard compartment with SuperLube 06/2014
- Replaced x-axis motor cable (all prints were failing) 08/18/2014
- x-axis idler pulley is lubricated every week with SuperLube.
- Installed new ball bearing x-axis idler pulley from Alm Gear ($18). 01/20/2015
- Tightened all belts. 01/20/2015
- Tightened all hex bolts holding plywood frame together. They were all loose again after 1000 hours of printing. 01/21/2015
- Tightened both grub screws on all six pulleys. They all tightened, but I noticed no difference in performance. 01/29/2015
- Removed the fan from the motherboard compartment. It is not needed for cooling (long story) and just makes noise. 02/11/2015
- Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN 12328
- Build hours:
- Projects:
- Maintenance:
- 24v/5v regulator replaced 3/14
- spool holders replaced
- indicator LEDs disconnected to prevent voltage damage to board by motors.