Makerbot machine logs
The status of Public Lab's 10 MakerBot Replicators.
Public Lab office, Propeller Workspace, 4035 Washington Ave, New Orleans, LA
Contact: Shannon Dosemagen
SN______ not operational
- Projects:
- Maintenance:
- SN______ not operational
- Projects:
- Maintenance:
- SN _____ not operational
- Projects:
- Maintenance:
.
Picayune, MS
- Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org
- SN______
- Projects:
- Maintenance:
- Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers).
- Left extruder inoperable due to cable break that I just have not fixed yet.
- The 5 volt power upgrade has not been performed yet.
.
Geography Department, University of Kentucky
- Contact: Jessi Breen
- SN______ not operational
- Projects:
- Maintenance:
.
Public Lab office, Brooklyn, NY, Former Pfizer building, 630 Flushing Avenue
- Contact: Liz Barry
- SN_____ not operational
- Projects:
- Maintenance:
.
Public Lab office, Pirate Ship, Sommerville, MA
- Contact Dogi
- SN_____
- Projects:
- Maintenance:
- Totally modded with live streaming RPi cam video
.
- Totally modded with live streaming RPi cam video
Hackrfarm/University of Massachusetts
- Contact: Ian Walls
- SN_______
- Projects:
- Maintenance:
.
LEAFFEST HQ, Salisbury, VT
- Contact: Chris Fastie whose gmail is cfastie
- SN 11837
- Initial build hours: 11, build hours on 02/07/14: 245
- Projects:
- Prototyping camera rigs for aerial mapping
- Experimenting with producing camera rigs for sale to Public Lab mappers.
-
- broken fan replaced 12/24/13
- new nozzles installed 01/04/14
- 24v/5v regulator replaced 01/17/14
- Filament feed mechanism upgraded (MakerBot replacement parts) 02/06/14
- Printed feet, spool holders, and LCD/keypad cover
.
Public Lab retail fulfillment center, Portland, OR
- Contact: Mathew Lippincott
- SN 12328
- Projects:
- 24v/5v regulator replaced 3/14
- spool holders replaced
indicator LEDs disconnected to prevent voltage damage to board by motors.
- Maintenance: